![]() The most common is a "LOAD SIDE" connection, made AFTER the main breaker. There are two basic approaches to connecting a grid-tied solar panel system, as shown in the wiring diagrams below. Always refer to the NEC code in effect or consult a licensed electrician for safety and accuracy. The utility connection for a PV solar system is governed by the National Electrical Code (NEC) Article 690.64. The purpose of this article is to give you a basic understanding of the concepts and rules for connecting a solar panel system to the utility grid and the household electrical box or meter. The good thing is that all the power changing process (from solar power to battery and vice versa) is fully automatic due to automatic UPS wiring and you don’t need to use an extra manual or automatic changeover or auto transfer switch to transfer the power between batteries and solar panels to the load points.Here are design tips for methods of PV system utility interconnection. We have covered up all the details in previous posts (links added in this post for more explanation). įor this reason, you will have to find how much wattage solar panel do you need and what is the required amount of backup power stored by later for later use etc.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |